For electricians in Ireland

Every circuit tested, every fail ready to quote.

Under the Electricity Regulation Act 1999, a Registered Electrical Contractor issues a completion certificate for all electrical work except minor works.

Set up the day you sign up.

Tick electrical and all of this is ready.

Your kinds of work.

  • Electrical call-out
  • Fault finding
  • Consumer unit replacement
  • Periodic inspection and testing
  • Rewire
  • EV charger installation
  • Lighting

Rename them or add your own in the office.

Registration, checked on the schedule.

  • Safe Electric: consumer unit replacement, periodic inspection and testing and rewire

Book someone onto this work with Book a visit, on the board or on the New job sheet, and it checks they hold it.

Built around the work.

Inspection sheets you build.

A Reading has a Unit and can have limits. Given a pass or fail set as its Answers, a reading outside its limits is a fail. A section asked As rows the engineer adds takes a row for each circuit.

Consumer units and last time’s readings.

A Consumer unit is kept at its address with its ways and main switch. A sheet started on one shows the figures from the unit’s last signed sheet of that kind. Circuit rows match by name, so each shows its own figures.

Findings, quoted.

A finding is filed against the address as Dangerous, Major, Minor or Advisory. Administrators are told about a dangerous one. Quote them on Findings turns the ones ticked into one draft quote to price.

Meters and their calibration dates.

Your meters sit under Test instruments, each with the Calibration due date that administrators are warned of thirty days ahead. A Test instrument question records the meter picked and that date.

Safe Electric certificate numbers.

A Safe Electric certificate is issued on ECS or on paper, outside the office. Add a certificate on the job records its number, issue day and who certified it. A paper one stays on Today until Posted is pressed.

A rewire is RCT work. An inspection is not.

A rewire, a new circuit or a repair to a building’s wiring is RCT work when a principal contractor pays. A periodic inspection with no repair in it is not, and the office bills one at 23% once you are registered.

Questions, answered.

Does a signed sheet record the engineer’s Safe Electric number?
Yes, when the sheet names Safe Electric Qualified Certifier as its Register recorded at sign-off. Signing it records the signer’s number under that register.
Does it look up Safe Electric registration?
No. Each person’s registration is kept as you record it, with its number and expiry date. Administrators are warned thirty days before one lapses. Booking someone not certified for the work can be set to Don’t check, Warn and allow or Refuse the booking.
Can it keep the MPRN for each property?
Yes. Each site has its own MPRN. When a sheet starts, a question on it can be Filled in from that MPRN.
Does the job sheet ask whether isolation was proved?
Yes. The job sheet every firm starts with asks whether isolation was proved before work started, answered pass, fail or N/A. A fail needs a note and a photo, and becomes a Major finding when the sheet is signed.

Ready when you are.

14 days of Business, free. No card needed.

Scheme names are used only to say which work the product is shaped around. No affiliation with, or endorsement by, any scheme is claimed.