Your kinds of work.
- Electrical call-out
- Fault finding
- Consumer unit replacement
- Periodic inspection and testing
- Rewire
- EV charger installation
- Lighting
Rename them or add your own in the office.
For electricians in the UK
In England, a private landlord must have every electrical installation in a let home inspected and tested by a qualified person at least every five years.
Tick electrical and all of this is ready.
Rename them or add your own in the office.
Book someone onto this work with Book a visit, on the board or on the New job sheet, and it checks your business holds it.
A Reading has a Unit and can have limits. Given a pass or fail set as its Answers, a reading outside its limits is a fail. A section asked As rows the engineer adds takes a row for each circuit.
A Consumer unit is kept at its address with its ways and main switch. A sheet started on one shows the figures from the unit’s last signed sheet of that kind. Circuit rows match by name, so each shows its own figures.
A finding is filed against the address as Dangerous, Major, Minor or Advisory. Administrators are told about a dangerous one. Quote them on Findings turns the ones ticked into one draft quote to price.
Your meters sit under Test instruments, each with the Calibration due date that administrators are warned of thirty days ahead. A Test instrument question records the meter picked and that date.
In England and Wales, NICEIC or NAPIT sends the householder a Building Regulations compliance certificate for work you notify. Add a certificate records its number. Your installation certificate is a sheet you build.
HMRC counts a complete rewire as installing a lighting and power system, inside CIS. Rewiring one faulty circuit is a repair, and wiring in extra sockets an extension, both outside CIS on their own.
14 days of Business, free. No card needed.
Scheme names are used only to say which work the product is shaped around. No affiliation with, or endorsement by, any scheme is claimed.