Solar and battery installers in the UK

Panels, inverter and battery, quoted and kept.

VAT Notice 708/6 counts the cabling, control panel and inverter fitted with PV panels as part of the solar panels.

Set up the day you sign up.

Tick solar panels and all of this is ready.

Your kinds of work.

  • Solar panel installation
  • Solar panel service
  • Solar panel fault finding
  • Inverter replacement
  • Battery storage installation
  • Solar panel bird proofing
  • Solar panel cleaning
  • Solar site survey

Rename them or add your own in the office.

Built around the work.

Install quotes with a battery as an extra.

A battery or bird mesh can be an Optional extra. Your customer ticks what they want, types their name and pays any Deposit by card on Stripe’s page to accept.

Each inverter and battery on record.

An inverter, a battery or the array can be kept on the site with make, model and Serial number, since What it is takes any words. Your customer is emailed three weeks before each one’s Warranty runs to date.

The roof and the meter, on the site.

Survey photos of the roof, the meter and the consumer unit can be kept on the site under Photos. An MPAN box can be added On every site under Your own fields in Settings.

Panels for a builder are CIS work.

HMRC counts installing solar panels as construction under CIS, except under a contract directly with a householder. A repair on its own is outside CIS.

Questions, answered.

Does it issue MCS certificates or notify the DNO?
No. Nothing is sent to MCS or to the network operator, and MCS certification is not checked. A commissioning sheet you build can ask Reading, Photo and Signature questions, and a Test instrument question records the meter used.
Is the deposit on a zero-rated install charged VAT?
No, once the install is priced. A quote’s card Deposit, or an invoice raised as A deposit before the work or A stage payment, is split over the VAT rates of the priced lines. Where every line is Zero rated, the whole amount is at 0%. With no price or work on a householder’s job yet, either invoice is at 20% once you are VAT-registered. The final invoice takes the deposit off at the rate it was charged.
Can it design the system or estimate its generation?
No. There is no roof layout, shading check or generation estimate. The system is quoted as lines, such as the panels, inverter, battery, scaffold and labour.

Ready when you are.

14 days of Business, free. No card needed.

Scheme names are used only to say which work the product is shaped around. No affiliation with, or endorsement by, any scheme is claimed.